Brushes come in various sizes and forms. For most people they are of pointed tip variety, however many other shapes can often help out, depending on your needs.
For me I tend to use the pointed tip range, but I do have a few others, flat brushes can be very useful when painting large figure Gauge O and buildings. Within the range of brushes I have, they range from '5' through to 'ooooo'. Depending on make, the '00000' can vary in size, it is best to look for brushes at trade stands or from makers that you have personal knowledge of.
I once purchased a 'oo' size brush that was thinner than my 'ooooo' brush from a named paint brand.
I use four different types of brush, these are divided by my judgement of their quality.
1. High quality, these are either by brush tips or brush hair type. The finest quality brushes are reserved for detail work. I once painted a station master, complete with watch chain in 'N' gauge, 'OO' gauge and Gauge O are both excellent working scales for fine detail work.
2. Mid range brushes, normally reserved for older high quality brushes and brushes used for general painting. As with high quality, the bristles must offer a good shape.
3. Cheap brushes are ideal for large amounts of non essential paint work, such as scenery. These can vary in size, but normally cheap brushes are sold in boxes or packs, offering mainly the larger type brushes. These packs also come in handy when applying PVA glue to models or scenes.
4. These are the left overs from the above three types, idea for weathering models, applying additional paint detail in places that are non essential.
Try to use brushes until the very end of their life span. If you do use brushes with PVA, just put them into hot water and rinse the PVA off, your brush is then ready for use again.
Friday, December 12, 2008
Sunday, December 7, 2008
Glues
Modelling uses different forms of glue, the most commonly used are:
PVA
Liquid Poly
Super Glues
Like paints, keep the lids on and once used recap them, never leave PVA near the track, clear-up spills immediately, forget the modelling, glue can cause disaster.
If you are lucky enough to be modelling in an environment that is wihtin your home, make sure the carpets are protected, ideally when building models, have a work bench type of area to use.
PVA
Liquid Poly
Super Glues
Like paints, keep the lids on and once used recap them, never leave PVA near the track, clear-up spills immediately, forget the modelling, glue can cause disaster.
If you are lucky enough to be modelling in an environment that is wihtin your home, make sure the carpets are protected, ideally when building models, have a work bench type of area to use.
Tuesday, November 25, 2008
Hornby Stanier 4MT 2-6-4T Class 4P
Just purchased two of these for running within the 'preservation' day-to-day role for the layout. Have run one of them very quickly, stunning locos, really worth the purchase and will fit nicely into the concept of Briers Grove.
I purchased them from Kernow Model Rail Centre, thanks to Trevor for sorting them out for me.
(will publish some photographs after my holiday)
I purchased them from Kernow Model Rail Centre, thanks to Trevor for sorting them out for me.
(will publish some photographs after my holiday)
Wednesday, November 19, 2008
"just a blog"
With my holiday approaching I decided that Thursday evening 20/11/08 would be the last night in the railway room. This is to tidy the place up, leaving it clutter free and ready for my return.
I'm also looking at some new storage boxes, some of the modelling items really do need a proper home, not just on the work bench, so this might be a purchase prior to my holiday.
Currently looking at a couple of loco purchases, the Class 4 2-6-4Ts Standard Tank early emblem.
I'm also looking at some new storage boxes, some of the modelling items really do need a proper home, not just on the work bench, so this might be a purchase prior to my holiday.
Currently looking at a couple of loco purchases, the Class 4 2-6-4Ts Standard Tank early emblem.
Elkin Station - Station Yard
This evening has seen a cleaning up evening, especially with my holiday looming.
Sunday turned into part running day, spent about two hours running locos and some freight. The track needed some minor cleaning, but all in all the locos ran first time so that is a bonus.
With the holiday just round the corner I wanted to finish the station yard off, to complete this I've put the fencing up on the platform of Elkin Station, photographs to be posted shortly.
This almost completes the furthest scenic area from Elkin Station to Tunnel Corner, what remains is to paint the small detailing kits and figures that make up the station yard feature.
This will now wait until I come home, perhaps Christmas will see me spending extra time finishing this section.
The next big section is the far end of Elkin Station, allotments and railway cottages, prior to entering the engine shed area of Briers Grove.
Sunday turned into part running day, spent about two hours running locos and some freight. The track needed some minor cleaning, but all in all the locos ran first time so that is a bonus.
With the holiday just round the corner I wanted to finish the station yard off, to complete this I've put the fencing up on the platform of Elkin Station, photographs to be posted shortly.
This almost completes the furthest scenic area from Elkin Station to Tunnel Corner, what remains is to paint the small detailing kits and figures that make up the station yard feature.
This will now wait until I come home, perhaps Christmas will see me spending extra time finishing this section.
The next big section is the far end of Elkin Station, allotments and railway cottages, prior to entering the engine shed area of Briers Grove.
Wednesday, November 12, 2008
"just a blog"
Another evening of track cleaning, Briers Grove Station is now running more freely, still a few minor sections of track to clean up, but it is running.
There's always something you miss when working on the layout, and tonight I found I hadn't cleaned the track properly after ballasting. So that job has to be finished off before I can really consider a running night.
There's always something you miss when working on the layout, and tonight I found I hadn't cleaned the track properly after ballasting. So that job has to be finished off before I can really consider a running night.
Tuesday, November 11, 2008
Tunnel Embankment - Near Side Pt2
I was looking at the photograph below and an idea struck me for my aims on this section of modelling.
Using the idea of the raised embankment, I've increased the length and the width of the embankment, this allows me a good base for building on to and also allows for greater scene detailing at a later date.
One of the problems I have is track cleaning, so most of the modelling this side of the main track has got to be modular to some degree, having the embankment much wider will allow me to position the section more easily and make it much stronger so that I can leave it in place rather than keep moving it.
I've just cut the shape of the first part of the embankment, I've got an idea in my head and if it works I can offer a little more of a story to history of Briers Grove branch line.
Using the idea of the raised embankment, I've increased the length and the width of the embankment, this allows me a good base for building on to and also allows for greater scene detailing at a later date.
One of the problems I have is track cleaning, so most of the modelling this side of the main track has got to be modular to some degree, having the embankment much wider will allow me to position the section more easily and make it much stronger so that I can leave it in place rather than keep moving it.
I've just cut the shape of the first part of the embankment, I've got an idea in my head and if it works I can offer a little more of a story to history of Briers Grove branch line.
Clutter & Chaos
This might seem stupid to mention, but from time to time you need to get into the modelling room/area and give it a good clear out.
I've just spent nearly 3 hours sorting out the modelling area, including boxes that I had collected of odds and ends. Now having cleaned the storage areas and sorted the remaining boxes into a sensible order I now have more room and can see what I do and don't need.
I've binned some really old modelling items I was keeping for a rainy day, sorted the junk from good and now have a good idea of what I have collected over the last few years.
As I'm working in my shed, I've put some hooks up and put models on to each hook near to where they should end up on the layout. This gives me an overview of what I was aiming for, but also makes sure I don't duplicate models.
My next evening will be to finish the clean up and sort out the modelling bench, I might even invest in some portable storage draws for the paints etc.
I've just spent nearly 3 hours sorting out the modelling area, including boxes that I had collected of odds and ends. Now having cleaned the storage areas and sorted the remaining boxes into a sensible order I now have more room and can see what I do and don't need.
I've binned some really old modelling items I was keeping for a rainy day, sorted the junk from good and now have a good idea of what I have collected over the last few years.
As I'm working in my shed, I've put some hooks up and put models on to each hook near to where they should end up on the layout. This gives me an overview of what I was aiming for, but also makes sure I don't duplicate models.
My next evening will be to finish the clean up and sort out the modelling bench, I might even invest in some portable storage draws for the paints etc.
Sunday, November 9, 2008
Tunnel Embankment - Near Side Pt1

I decided I wanted some of the running to be obscured by the modelling, so the tunnel was a good place to start. Working from the rear out does mean that some of the scenic modelling will need to wait for some time, as I'm working from right to left and back to front.
To give the effect I'm looking for I've started on the near embankment to give an idea of what it might look like when completed. I wanted this raised to offer a more 3D effect rather than all being the same level. This first embankment seen in the photographs is just for ideas and to offer a little more for viewing when running stock.
I have an idea for modelling this section, but first need to finalise the purchase of some kits prior to creating the scene. As you can see from the photograph, the curve offers a good scenic location for photography, so the embankments will offer a good modelling opportunity in the future.
Station Yard

Having spent a few days preparing the scenics around the yard area, I was itching to get the fencing erected. My problem was that not really knowing what the yard scene would look like, I really did need to try some ideas out. My favourite to date is the one featured in the current set of photographs, of course this may change towards the finalised scene.
Once I was happy I began the preparations for modelling the fencing, I need plenty of room for track cleaning so had always planned on the fence being further back with space for railway maintenance gangs to work.
I drilled some small holes by hand for the fence posts, put some plaster in the holes and on the fence post and then set the fencing up. I also used some neat PVA on two sections to give further strength. Adding the gate was a little trickier, I really should have waited, but I felt the positioning would be easier and with the fence still tacky offered greater flexibility when positioning.
The open section of fencing between the platform ramp and yard will have a small work scene included, yet to be finished. Most of the major parts of the yard scene are complete, just finishing touches for the models. The next two stages are to complete the allotments at the other end of the station and the current end of the platform, the latter has been in planning for the last few weeks, models and ideas being tested for scenic value.
The allotments are halfway through completion, I started these some time back and have been tinkering on and off with them. I have some new models to put in the scenes and this should offer a good run of scenic viewing when finished. Once this is complete I will need to start looking at some time tables for the layout, especially over the coming months of winter.
Subscribe to:
Posts (Atom)